The ONA achieved a breakthrough agreement with tribal officials for a re-designed beach access path (click here: Plan “D”) at the Oceanside Wayside that will require little or no excavation in culturally sensitive areas. Work can now begin on the engineering details and revised permits for of the re-design. The original funding for the county remains in place.







